We knit openwork tops. Blue openwork top with an elongated back

36/38 (40/42) 44

You will need

Yarn (100% silk; 290 m / 50 g) - 150 (200) 200 g dark blue; knitting needles No. 3; circular knitting needles number 3.

Patterns and schemes

Elastic

Knit chrome., alternately 1 person. and 1 out., chrome.

Front surface

Knit in the front rows of the front, in the back rows of the wrong loops.

Openwork pattern A

Rapport at the beginning of the pattern = 18 p.: Knit according to the above pattern 1. Only persons are given on it. ranks. In out. rows, all loops and crochets knit purl.

In height, repeat 6 times from the 1st to the 8th row = 48 p., Then knit from the 49th to the 82nd row, while narrowing the openwork pattern, as indicated, knit the remaining loops of faces. satin stitch.

Starting from the 83rd row, continue to knit on the remaining 8 stitches in garter stitch.

Openwork pattern B

Rapport at the beginning of the pattern = 18 sts: knit like openwork pattern A, but according to the above pattern 2.

Pattern Sequence

Knit chrome,
18 p. openwork pattern BUT,
103 (113) 123 p.
18 p. openwork pattern B,
chrome = 141 (151) 161 p.

Garter stitch

Knit in the front and back rows of the front loops.

nodular edge

Edge knit in persons. and out. front rows.

Knitting density

27.5 p. x 32 p. \u003d 10 x 10 cm, connected with patterns in the indicated sequence.

indication

On the sides of the work, constantly knit edge loops as a nodular edge.

Pattern


Completing of the work

Back

Dial 140 (150) 160 p. And knit 5 cm for the strap with an elastic band, while starting from the inside. row and in the last row add 1 p. = 141 (151-161) p.

After 25.5 cm = 82 p. from strap = simultaneously with the beginning of knitting in garter stitch, add on both sides for the sleeves " bat» 1 time for 1 p. and 9 times in each 6th p. 1 p., added loops knit garter stitch = 161 (171) 181 p.

Through 44.5 (46.5) 48 cm = 142 (148) 154 p. from the bottom bar, perform short rows for shoulder bevels. To do this, on both sides at the beginning of the row, knit 4 times for 6 p. And 3 times for 7 p. (6 times for 7 p. And 1 time for 8 p.) 1 time for 7 p. And 6 times for 8 p. less, each time turn with 1 crochet.

Next, knit 1 person. a row on all loops, while knitting the yarn over together with the previous knit loop with a slope to the left (= 1 p. remove, as in the case of knitting, knit the yarn over the faces. and stretch the loop through the knitted yarn) or knit the yarn with next loop together persons., in order to finished product there were no small holes. In conclusion, close all loops at a height of 49.5 (51.5) 53 cm = 158 (164) 170 p. from the plank, including the nodular edge.

Before

Knit like a back, but for the strap, knit only 1.5 cm = 5 p. rubber band. In addition, close the middle 15 p. of the neck already at a height of 44.5 (46.5) 48 cm = 142 (148) 154 p. from the bottom bar. To round the cutout, close from the inner edge in every 2nd p. 7 times for 4 p.

Assembly

Run shoulder seams.

For the inlay, dial along the edge of the neck on circular knitting needles 143 p. Knit 1 circle. persons. Then close all the loops, as with persons. knitting.

Run side seams to the garter stitch area.

Photo: magazine Verena. Special Issue" No. 2/2018

Size - 34/36

You will need:
100 g purple, 50 g each turquoise, pink. hot pink and blue Catania yarn (100% cotton, 125 m / 50 g);
knitting needles number 2.5.

Patterns on the needles: small pearl pattern - alternately 1 person. 1 out., shifting loops after each row

Garter stitch: persons. and out. p.- persons. n. Front surface: persons r. - persons. p., out. r - out. P.

Openwork pattern on the knitting needles: the number of loops is a multiple of 24 + 23 medium stitches + 2 chrome. Knit according to scheme 1. on which only persons are shown. r .. in out. R. knit all loops in the appropriate colors according to the pattern or as indicated, knit yarns out. Start with 1 crochet and yarn over before 1st rapport, repeat 1st rapport, knit an average 23 stitches between rapports, then repeat 2nd rapport, end with yarn over after 2nd rapport and 1 chrome. Repeat 1 time from the 1st to the 22nd p., while knitting the 1st - 10th p. turquoise, 11th and 12th p. pink and 13th - 22nd p. purple thread.

Pattern of holes: the number of loops is a multiple of 4 + 7 middle sts + 2 chrome. Knit like an openwork pattern, but according to scheme 2. Knit with a pink thread 1 time from the 1st to the 6th p

The sequence of alternating patterns on the knitting needles: 6 p. small pearl pattern purple. * 22 r openwork pattern, 4 r. bright pink faces, 4 p. garter stitch turquoise, 4 p. persons. smooth purple, 2 p. smooth blue faces, 6 p. pattern of holes, 6p. smooth blue faces, 2 p. garter stitch hot pink, 4 p. persons. smooth purple, repeat from * 1 time, finish 10 p. openwork pattern and 4p pink garter stitch = only 128 r

Decrease: The V-shape is the result of even decreases and additions. To do this, knit in each face. R. in the middle 3 p. together with a broach (see legend) and for alignment, add on both sides after or before chrome. 1 p., including these loops in the pattern. Thus, the number of loops remains constant up to the armholes. Attention! In the openwork pattern and the pattern of holes, the central reductions are indicated. The additions are obtained due to the 1st or last yarn, due to the pattern or due to knitted crosses. P.

Knitting density, sequence: 25 p. and 40 p. = 10x10 cm.

Back/Front: Cast on 97 sts with purple thread, mark middle st and work in decreasing order. After 18 cm - 72 r from the typesetting edge, do not add 7 times for armholes on both sides, but continue to decrease in the middle = 83 p. After 21.5 cm = 86 r. from the typesetting edge, additionally dial for the shoulder strip on both sides with a turquoise thread 23 p \u003d 129 p. Continue working in the indicated sequence, while not doing 21 times from the edge on both sides of the additions, but continue decreasing in the middle Attention! To the beginning of the 3rd openwork strip (through 28.5 cm = 114 r from the typesetting edge) in work 101 p. Perform an openwork pattern as described, while to compensate for the 1st or last yarn due to the pattern, additionally knit in each face . R. at the beginning of the row after chrome 2 sts together. at the end of the row, knit to chrome. 2 p. Together with a broach Through 32 cm = 128 p. from the typesetting edge close the remaining 87 p.

Assembly: Sew shoulder and side seams.
Knitting patterns on knitting needles and a top pattern

Various types of knitting provide us with unlimited space for imagination. Tops are:

  • tailored from separate halves - both of the same type and different in color and even in pattern (the back can be made denser);
  • knitted in a circle - in this case, the top is knitted whole canvas, straps are then sewn separately.

By the way, straps can be thin, crossed, made in the form of braids, wide or be a single loop around the neck.

What will the top be like - weightless, like a cobweb? Strict? Or erotic, emphasizing the dignity of the figure? For a translucent version, it is better to sew a lining in a neutral or contrasting shade, which will help fix the shape and hide unnecessary details from immodest glances. We make the neckline round, square, V-shaped or wavy - this is very suitable for tops with floral ornaments.

On hot days, a short top will become indispensable - barely covering the stomach (if the figure allows) or a little longer. For a ceremonial exit or for work in the office, a more strict option is suitable - for example, to the middle of the thigh.

Color and yarn selection

The yarn is also selected according to your wishes and needs. Pleasant to the touch and environmentally friendly, a top made of linen or cotton will perfectly harmonize with both a skirt and trousers. However, do not forget: using a thread made from natural fibers for knitting, you will get a rather heavy product.

Why not choose acrylic, viscose, wool or mixed yarns? A striped or melange top looks great. The yoke can be trimmed with a contrasting color.

Dare! hand tied a skilled craftswoman, an openwork top can become a chic detail of your wardrobe!

Knitting an openwork top, models from our website

Many different tops were knitted by our needlewomen, we invite you to look at their creations!

interesting selection to the website 14 children's topics, without an adult

Hello girls! Another update for the end of summer. Yarn "Alize miss" (100% mercerized cotton). It took a little more than four hanks (280m in 50g). Needles number 2.

Knitting pattern for openwork top


Conventions

Good day to all needlewomen! I bring to your attention my version of an openwork top with a pattern of leaves with a small yoke. The top is knitted from cotton yarn Pekhorka Summer (330 m in 100 gr), Fuchsia color with knitting needles No. 2.5. It took 2 and a half hanks for my little top for my daughter.

I want to say that this yarn is difficult to knit, the thread is very twisted, so when knitting I had to constantly unwind the knots, I suffered ... In my version of the top, not 5 rapports, but only 4, so I dialed 101 loops for the back and front (24 p. Pattern + between the rapports, 1 loop each (knitted with the front twisted so that the borders of the drawings could be better seen = 3 loops) + 2 edge loops); 8 patterns in height.

I knitted the armholes, as in the description, but for the coquette in the description it is indicated very a large number of loops (95), for my daughter, by trial and error, it took only 44 loops, I did the reduction of loops for armholes immediately (in the description after 4 cm of the beginning of the coquette). Since there are only 4 rapports, then in the yoke the central leaf turned out to be in the middle (between the second and third stripes), but in my opinion, it also turned out well. The height of the coquette has also been reduced. The top is crocheted with a small crustacean step.

Top with openwork patterns - Marina's work

Hello girls! Summer's soon! I started to prepare myself for warm days. Contacted here is such a topic. Yarn "Lily of the valley" (100% cotton). It took a little more than 4 hanks (115m in 50g). Needles number 3.

Description of openwork top

Size: S. Materials: 200 g of Nako Lady yarn (75% microfiber, 10% polyester, 10% metallic thread, 5% sequins, 50 g / 150 m), knitting needles No. 4.5, hook No. 3.

The main pattern of the openwork top (see diagram): 1st row (persons. side): persons. loops. 2nd row (wrong side): out. loops. 3rd row (person. side): 2 persons., * nakid, remove the loop as the front, 2 persons together, throw the removed loop on the knitted one, nakid, 1 person., repeat from * to the end of the row. 4th row (wrong side): out. loops. Repeat rows 1-4 for the main pattern.

Before top: dial 7 loops, connect in a circular row. 1st row: (1 person., nakid) - 6 times, 1 person. = 13 loops. Continue to knit back and forth according to the scheme of the 2nd row and all purl rows: purl. loops 3rd row: chrome. loop, (nakid, 3 persons., nakid) - 3 times, chrome. the loop. 5-27 rows knit according to the scheme. Continue to knit according to the scheme until the 55th row, at the same time add 1 loop on each side in each row - 23 times, knit new loops with front stitch until the completion of the scheme, and then with the main pattern. 56th row: out. loops. Knit with the main pattern - 32 cm. Close the loops.

Top back: cast on 78 stitches. Knit with the main pattern - 38 cm.

Top armholes: start decreasing on each side 1 loop in each row - 21 times. At a height of 57 cm. Close the loops.

Sleeve: dial 60 loops. Knit with the main pattern - 2 cm. Start decreasing on each side 1 loop in each row - 23 times. At a height of 15 cm, close the loops.

Top assembly: Sew sides, sew sleeves Neck tie: 1 tbsp. b / n, * skip 1 cm, 1 tbsp. s / 2n., 1 tbsp. b / n, repeat from * - columns with 2 crochets made arches. 2nd row: 3 picot in each arch, connecting st to single crochet. Finish work. Tie the armholes and the bottom of the model in the same way.

They asked me to knit a top / blouse, they gave me a magazine with a description, yarn and the work began to boil.,. Here's what happened in the end. Please rate. In my opinion, a very summer model! Just asked not to make a very deep cut.
Yarn “Rose” Vita 150m/50 gr. Consumption - 300 gr for size 42-44, knitting needles No. 3. The work of Ludmila Petrova.

Description of the top with knitting needles

  1. Sizes: 34/36 (P1). 38/40 (R2), 42/44 (RZ), 46/48 (R4).
  2. You will need: Bouton d'Or yarn: 5/5/6/7 skeins of Surya (50% viscose fiber from bamboo. 45% fiber from soy, 156 m/50 g) blue (1013); knitting needles number 3. Patterns: pizza. smooth surface, st. b/n. Art. s / n.
  3. Gum 1 / 2.1st p.: * 1 person., 2 out. *; 2nd p.; * 2 persons., 1 out. *. Repeat 1st and 2nd p.
  4. Openwork pattern: knit according to the scheme, which shows only odd rows, knit even rows according to the pattern.
  5. Decrease 1 p. at a distance of 2 p. from the right edge: 2 p., 2 p. Together with a slope to the left.
  6. Decrease 1 p. at a distance of 2 p. from the left edge: 2 p. together persons., 2 p.
  7. Knitting density, openwork pattern: 24 p. and 35 p. = 10 x 10cm.

Knitting pattern and top pattern with an openwork pattern

The red top is another new thing for summer days. Yarn “LIRA” (60% cotton, 40% acrylic). It took about 5 hanks (150m in 50g). Needles number 2.5. Artwork by Marina Efimenko.

I knitted a pattern according to this pattern, only the braids crossed three by two.

The number of loops is a multiple of 14 + 13. Knit according to the scheme, which shows the front rows, in the wrong rows, knit the loops according to the pattern, knit the crochets with the wrong ones. Repeat rapport from the 1st to the 22nd row.

Attention! The number of crochets should correspond to the number of reduced loops and vice versa.

The model is knitted with needles No. 2, threads “Narcissus” (100% cotton). The front and back are knitted separately with an openwork pattern, the sleeves are knitted with a garter stitch. The work of Elena Vladimirovna.

Description of openwork top

Garter stitch: persons. and out. R. - persons. P.
Openwork pattern: the number of loops is a multiple of 12 + 6 + 2 chrome. Knit according to the scheme, which shows only persons. r., in out. R. all loops and nakida knit out. Start with 1 chrome, repeat rapport, end with loops after rapport and 1 chrome. Connect all the details, tie the neck and sleeves as follows: 2 persons together, 1 yarn over, 2 persons. (repeat from the beginning). Tie a cord and thread through the yarn over holes.

I knitted this top for a long time with circular needles 2.0. Chosen by me pink color thread perfectly matched my appearance. I tied it up very quickly. The amount of yarn depends on the size. The yarn is pure cotton. I hope this wonderful top will bring you pleasure. Simple, not for the podium, things will bring joy and become favorites in the wardrobe. Enjoy your leisure time! The work of Nadezhda Lavrova.

Description of the openwork top from the magazine

Top sizes: XXS(XS)S(M)L(XL)XXl.

Dimensions of the finished top: waist circumference 77(83)88(94)100(106)112 cm, length 50(51)53(55)57(58)59 cm. You will need: Sandnes mandarin petit yarn (100% cotton, 180 m/50 g ) 250(250)250 (300)100(350)350 g coral color, circular knitting needles No. 2.5 and 3. Top knitting density: 27 p. persons. stitch on knitting needles No. 3.0 = 10 cm. Edge loop: first and last loop knit faces. in every row.

Top yoke : cast on needles No. 3 25 p. Knit 2 rows of faces in stockinette stitch. Next, knit the pattern according to scheme A. With a work length of 96 (102) 110 (118) 126 (134) 142 cm, when the pattern is completely completed, close the loops and connect the short edges of the part.

Top yoke top: dial on the other edge of the yoke on knitting needles No. 3, 1 st from each loop, while skipping 4 sts = 252 (274) 296 (318) 340 (360) 382 sts. row and close at the same time evenly 52 (54) 56 (58) 60 (62) p. - 200 (220) 240 (260) 280 (300) 320 p. , tie 1 persons. row, while at the same time decrease the number of loops evenly to 134 (140) 148 (154) 162 (170) 178. Neck edge: Change to needle size 2.5 and work 7 rows in pearl pattern F. Bind off in pearl pattern.

The bottom of the top: cast on the bottom edge of the coquette 1 st from each loop, while skipping 7 loops. Knit 1 out. row and cast on/cast off evenly so that there are 288(310)33 2(354)376(398)420 sts. Work pattern C. Cast on an additional 9(9)9(9)15(15)15 rows evenly 34(36)38(40)42(44)46 sts = 322(346)370(394)418( 442) 466 p. Continue to knit the pattern according to the pattern to the end. Link 1 persons. row. Next row: 92(10 0)108(116)124(132)140 out. sts (= back), bind off 69(73)77(81 (85(89)93 sts, working them out (= sleeve), 92(100)108(116)124 (132)140 sts. ( = front), cast off 69(73)77(81)85(89)93 sts, purl them out (= second sleeve).

Top front and back: knit loops on the back of the front, cast on an additional 12 sts, knit the front of the faces. loops, cast on an additional 12 loops = 208(224)240 (256)272(288)304 p. according to scheme E up to the length of the work 49 (50) 52 (54) 56 (57) 58 cm. Then knit according to scheme C 1 the full pattern horizontally. Bind off on last row.

Openwork top from the Internet

The variety of summer tops cannot be presented in one article, but we tried to show a few more beautiful models from the internet.

This summer top is perfect for hot days. Spacious and openwork, it will hide some flaws with excess weight. Description by designer Amy Gunderson translated from Creative Knitting magazine.
Sizes: S (M, L, XL, 2XL, 3XL),
Chest circumference - 96.5 (106.5, 117, 127, 137, 147.5) cm,
Length - 61 (63, 64, 64, 66, 68.5) cm.
Needed yarn: Universal Yarn Fibra Natura Cotton True Sport (100% cotton; 180 m / 50 grams per skein) - 6 (7, 7, 8, 9, 10) skeins.
Tools: 60 cm circular needle size 3.25, extra needle, stitch markers, stitch holders.

Knitting density:

  • 21 sts and 31 rows = 10 cm mesh pattern after steaming;
  • 21 sts and 28 rows = 10 cm of ribbed pattern after steaming;
  • 21 sts and 28 rows = 10 cm in ribbing pattern after steaming;
  • 58 front panel loops after steaming = 20.5 cm.

Drawing "Wavy openwork plaits": Knit according to the scheme:

Openwork top - sleeveless knitting

knitting patterns for an openwork top:

Bright openwork top - T-shirt

So, Yarn “Pearl” from Pekhorka 50% cotton 50% viscose 100g / 425m, it took a little more than 1.5 skeins for my size 42-44, knitted as always with knitting needles No. 3. I knitted from top to bottom, on the neck I scored 126p (41p in front + 41p back + 20p sleeve + 20p sleeve + 4p. Raglan loops), raglan on the back is normal, and openwork in front:


Sleeves, neck and bottom tied with a garter stitch! Well, like everything.

Navy blue knitted top with openwork pattern

Dimensions: 36/38 (40/42). Differing data for size 40/42 is shown in parentheses. If one value is specified, then it applies to both sizes.

You will need: 400 (450) g ​​dark blue (col. 9) Lana Grossa CASHCOT yarn (85% cotton, 15% cashmere, 130 m / 50 g); straight knitting needles No. 4.5; circular knitting needles No. 4, 60 cm long.

Facial surface: persons. R. - persons. p., out. R. - out. P.; in circular rows constantly knit faces.

Pattern with braids and dropped loops: knit according to the scheme. The numbers on the right edge indicate individuals. R. In out. R. knit loops according to the pattern or in accordance with the symbols. In width, start from the loop to the 1st arrow, repeat the rapport loops between the arrows = 6 p., End with loops after the 2nd arrow. In height, perform 1 time from the 1st to the 32nd p., Then repeat from the 9th to the 32nd p. The number of loops in the rapport varies from row to row; in the instructions, the number of loops at the beginning of the pattern is taken as the basis for the calculation.

Knitting density. Pattern with braids and dropped loops, knitting needles N ° 4.5: 20 p. and 30 p. = 10 x 10 cm: faces. smooth surface, knitting needles No. 4.5: 20 p. and 31 p. = 10 x 10 cm.

Back: on knitting needles No. 4.5, dial 90 (102) p. and first tie 1 out. R. persons. Then knit with a pattern with braids and dropped loops: chrome., 1 p. To the 1st arrow, 14 (16) x 6 p. Rapport = 84 (96) p., 3 p. After the 2nd arrow, chrome. After 53 cm = 159 p. from the typesetting edge, close on both sides for armholes 4 p., then in each 2nd p. 1 x 2 and 1 x 1 p. Next, knit straight. After 18 (19) cm = 54 (58) p. from the beginning of the armhole, close all the loops.

Before: knit like a back, but with a round neckline. To do this, after 10 (11) cm = 30 (34) p. from the beginning of the armhole, close the middle 22 sts and finish both sides separately. For rounding, close from the inner edge in every 2nd p. 1 x 4, 1 x 3, 1 x2 and 6 x 1 p. Close the remaining shoulder loops at the height of the back.

Sleeves: on knitting needles No. 4.5, dial 62 (66) p. And knit faces. satin stitch. After 2 (4) cm = 6 (12) p. from the typesetting edge, close on both sides for the sleeves 3 p., then in each 2nd p. 5 x 1 p., in every 4th p. 3 x 1 p. and again in every 2nd p. 8 x 1.1 x 2 and 1 x 3 p. In the next row, cast off the remaining 14 (18) p.

Assembly: perform seams. On circular knitting needles No. 4, dial 116 sts along the neckline and knit 2 cm faces. satin stitch. Then loosely close the loops. Stitch sleeves.

Pattern
Knitting pattern

Blue jersey.

BLUE SPOKE T-SHIRT

This original top with patterns is made on knitting needles in one color. According to the description from the magazine, the model is knitted in 3 colors. Size - 34/36 You will need: 100 g of purple, 50 g of turquoise, pink. hot pink and blue Catania yarn (100% cotton, 125 m / 50 g); knitting needles number 2.5. Patterns on the needles: small pearl pattern - alternately 1 person. 1 out., shifting the loops after each row Garter stitch: persons. and out. p.- persons. n. Front surface: persons r. - persons. p., out. r - out. p. Openwork pattern on the knitting needles: the number of loops is a multiple of 24 + 23 medium p. + 2 chrome. Knit according to scheme 1. on which only persons are shown. r .. in out. R. knit all loops in the appropriate colors according to the pattern or as indicated, knit yarns out. Start with 1 chrome and yarn over before 1st rapport, repeat 1st rapport, knit an average 23 stitches between rapports, then repeat 2nd rapport, end with yarn over after 2nd rapport and 1 chrome. Repeat 1 time from the 1st to the 22nd p., while knitting the 1st - 10th p. turquoise, 11th and 12th p. pink and 13th - 22nd p. purple thread. Pattern of holes: the number of loops is a multiple of 4 + 7 middle sts + 2 chrome. Knit like an openwork pattern, but according to scheme 2. Knit with a pink thread 1 time from the 1st to the 6th p. The sequence of alternating patterns on the knitting needles: 6 p. small pearl violet pattern. * 22 r openwork pattern, 4 r. bright pink faces, 4 p. garter stitch turquoise, 4 p. persons. smooth purple, 2 p. smooth blue faces, 6 p. pattern of holes, 6p. smooth blue faces, 2 p. scarf knitting bright pink, 4 p. persons. smooth purple, repeat from * 1 time, finish 10 p. openwork pattern and 4p garter-knit pink = total 128 r Decrease: V-shape is obtained as a result of uniform decreases and additions To do this, knit in each face. R. in the middle 3 p. together with a broach (see legend) and for alignment, add on both sides after or before chrome. 1 p., including these loops in the pattern. In this way, the number of loops remains constant up to the armhole. Attention! In the openwork pattern and the pattern of holes, the central decreases are indicated. The additions are obtained due to the 1st or last yarn, due to the pattern or due to knitted crosses. p. Knitting density, sequence: 25 p. and 40 p. \u003d 10 × 10 cm. Back / front: with a purple thread, dial 97 l., mark the middle loop and knit in the indicated sequence with decreases. After 18 cm - 72 r from the typesetting edge, do not add 7 times for armholes on both sides, but continue to decrease in the middle = 83 p. After 21.5 cm = 86 r. from the typesetting edge, additionally dial for the shoulder strip on both sides with a turquoise thread 23 p \u003d 129 p. Continue working in the indicated sequence, while not performing 21 times from the edge on both sides of the additions, but continuing to decrease in the middle Attention! To the beginning of the 3rd openwork strip (through 28.5 cm = 114 r from the typesetting edge) in the work 101 p. Perform the openwork pattern as described, while additionally to compensate for the 1st or last, due to the pattern, the yarn over knit in each person. R. at the beginning of the row after chrome 2 sts together. at the end of the row, knit to chrome. 2 p. together with a stretch Through 32 cm = 128 p. close the remaining 87 sts from the cast-on edge. Assembly: perform shoulder and side seams.